On other pages

Tuesday, November 16, 2010

K&A Canal: Bath Flight - change to stoppage

Bath Flight from Widcombe Lock(7) to Bath Top Lock(13)
Stoppages:
Wednesday 8th and Thursday 9th December for scaffold installation.
Thursday 17th and Friday 18th February for scaffold removal.

The stoppage for refurbishment work on the iron tail bridges over the locks has been changed and the flight will stay open through the Winter, albeit with a reduced headroom of 2.4m from 10th December 2010 until Saturday 19th February 2011 when the flight will be re-opened for normal operation.


KAcanalTIMES is now online at www.kacanaltimes.co.uk

No comments:

Post a Comment